Skip to main content

Concrete Delivery and Initial Pour

17:20
23:35
19.8K views

At 17:20 in

I DON'T TRUST COLLEGES!

What happens here

A large concrete mixer truck arrives on site, backing up to the prepared formwork. A worker guides the discharge chute of the truck, allowing fresh concrete to flow into the forms. The concrete is initially poured in a section of the slab, with workers using shovels and concrete rakes to roughly spread the material and prevent excessive mounding. The concrete is placed close to its final position, ready for subsequent leveling.

Goal: The concrete truck arrives, and the initial pour of concrete is managed directly from the truck's chute into the prepared forms.

Tools and materials

  • Concrete Mixer Truck (Cemstone)
  • Concrete Rake
  • Shovels
  • Wet Concrete

What they say

Hide

didn't want big fat chunks of dirt and whatnot in it right [Applause] see that concrete guy that's a skilled profession that guy will make a living and he'll have a job always no matter where he goes whether he's driving a concrete truck or something else being a driver is a skilled profession pouring

Auto-generated from the video audio.