Screeding and Floating the Concrete Slab
At 19:55 in
I DON'T TRUST COLLEGES!
What happens here
After the concrete has been roughly spread, use a long, straight screed board (often a 2x4 or aluminum screed) to level the concrete surface. Two workers pull the screed board across the forms and screed guides with a sawing motion, removing excess concrete and filling low spots. This establishes the final height and levelness of the slab. Once the concrete is screeded, begin floating the surface using hand floats, such as magnesium floats. This process helps to embed the aggregate just below the surface, remove any remaining imperfections, and bring a smooth, creamy paste to the top. Floating is essential for preparing the concrete for subsequent finishing steps and achieving a dense, uniform surface.
Goal: This crucial step involves precisely leveling the poured concrete using a screed board and then smoothing the surface with hand floats to create an even and workable finish.
Tools and materials
- Hand Floats (Magnesium Floats)
- Rake (Metal Landscape Rake)
- Rubber Boots
- Screed Board
- Work Gloves
What they say
(316 characters)Hide
What they say
(316 characters)Auto-generated from the video audio.