Ground Excavation and Rough Leveling
1:40
23:35
19.8K views
At 1:40 in
I DON'T TRUST COLLEGES!
What happens here
Using a compact utility loader (Cast Loaders 40XD) with a front bucket, the crew begins excavating the soft, wet black soil from the designated area for the concrete slab. Workers use shovels and rakes to assist in the removal of excess soil and to perform a rough leveling of the ground, ensuring the area is clear for subsequent steps. This process involves multiple passes with the loader to remove significant amounts of soil.
Goal: This step involves excavating the existing soil and performing an initial rough leveling of the area where the concrete slab will be poured.
Tools and materials
- Cast Loaders 40XD
- Rakes
- Shovels
- Black Soil
What they say
(1,069 characters)Hide
What they say
(1,069 characters)Auto-generated from the video audio.