Skip to main content

Final Assembly and Equipment Preparation

2:01
18:42
85.8K views

At 2:01 in

I don't know if this trailer is worth saving.

What happens here

After the new wooden decking is installed and secured, the trailer is ready for final touches. This includes replacing all worn tires with new ones. Additionally, the narrator mentions that the large excavator, which the trailer is meant to haul, also needs attention. Its computer system needs replacing due to damage from varmints chewing through wiring during winter storage. This finalizes the trailer's readiness for operation and prepares the excavator for future use.

Goal: Complete trailer assembly and prepare associated equipment for use.

Tools and materials

  • Jack — Lifting the trailer to change tires
  • Tire Iron/Wrench — Replacing tires
  • Excavator Computer System — Replacing damaged computer
  • New Tires — Replacing worn tires

What they say

Hide

in a perfect world we'd replace every single board but finding two and a half inch thick oak is difficult at best so we're going to only replace the wood that we absolutely have to and i'm going to head over to reuben's custom saw milling and mill the rest of the wood that we need to complete this project [Music] yeah i know this is the trailer we use to haul our big excavator except nobody's been comfortable hauling our big excavator on it until it gets rebuilt so i want to get the big excavator rebuilt which means i gotta get this rebuilt with the boards off it's a good opportunity to give it a washing of a lifetime plus that's gonna make welding and

Auto-generated from the video audio.