Electrical Panel Termination and Power-Up
At 4:50 in
HOW TO INSTALL IYILO 48 AMP HARDWIRED EV CHARGER! | Day in the Life of a Residential Electrician
What happens here
The installer's brother, also an electrician, completes the termination of the 8/2 Romex wire inside the electrical sub-panel. The two hot wires are connected to the 40-amp double-pole circuit breaker, and the ground wire is connected to the ground bar. The installer emphasizes the importance of separating neutrals and grounds in a sub-panel for safety and code compliance. After verifying all connections are secure, the installer flips the 40-amp breaker to the 'ON' position. The charger immediately powers on, indicated by a green lightning bolt icon (power) and a blue Wi-Fi icon illuminating on the unit, confirming successful installation.
Goal: Connect the circuit breaker and energize the charger
Tools and materials
- Electrical Panel Square D — The main distribution point for electricity in the shed
- Multimeter Fluke — To verify voltage and continuity before powering on
- Screwdriver — To tighten terminal screws in the electrical panel