Skip to main content

Unloading and Hauling Materials

2:40
11:58
30.8K views

At 2:40 in

How to install a Waterfall feature in 2 hours and 20 minutes Steps 1-6

What happens here

The team begins by efficiently unloading all necessary materials from a Toyota Tundra pickup truck, including the pre-packaged Aquascape Pondless Waterfall Kit (which contains the water storage basin, pumps, plumbing, and lights), 12-15 large boulders, approximately five buckets of river stones, and a wheelbarrow. These items are then transported to the designated installation area.

Goal: Transport all necessary components to the installation site.

Tools and materials

  • Boulders — Structural and decorative elements for the waterfall
  • River Stones — Fill material and decorative elements
  • Shovel — Assisting with moving stones and gravel
  • Toyota Tundra Pickup Truck Toyota Tundra — Transporting materials to the job site
  • Wheelbarrow — Hauling stones and gravel

What they say

Hide

what wrapped up right here Fama's on timer and it doesn't set back so 60 no 509 is when we're launching this thing you can look at Chris go holy crap 12 to 15 bigger boulders and then a handful of small cobblestones so Brian you just