Unloading and Hauling Materials
2:40
11:58
30.8K views
At 2:40 in
How to install a Waterfall feature in 2 hours and 20 minutes Steps 1-6
What happens here
The team begins by efficiently unloading all necessary materials from a Toyota Tundra pickup truck, including the pre-packaged Aquascape Pondless Waterfall Kit (which contains the water storage basin, pumps, plumbing, and lights), 12-15 large boulders, approximately five buckets of river stones, and a wheelbarrow. These items are then transported to the designated installation area.
Goal: Transport all necessary components to the installation site.
Tools and materials
- Boulders — Structural and decorative elements for the waterfall
- River Stones — Fill material and decorative elements
- Shovel — Assisting with moving stones and gravel
- Toyota Tundra Pickup Truck Toyota Tundra — Transporting materials to the job site
- Wheelbarrow — Hauling stones and gravel