Dig Out Location
4:08
11:58
30.8K views
At 4:08 in
How to install a Waterfall feature in 2 hours and 20 minutes Steps 1-6
What happens here
Using shovels, excavate the area within the marked perimeter. As you dig, place all the removed soil (known as 'spoils') directly adjacent to the excavation site. This soil will form a 'berm,' which is a raised mound that provides the necessary elevation and natural topography for the waterfall to flow realistically. The excavation should be dug approximately 4 inches below the intended final grade to ensure a natural, sunken appearance for the basin.
Goal: Excavate the basin area and create a berm for waterfall elevation.
Tools and materials
- Shovels — Excavating the soil for the basin
- Wheelbarrow — Transporting excavated soil if the berm is not immediately adjacent
What they say
(1,129 characters)Hide
What they say
(1,129 characters)Auto-generated from the video audio.