Skip to main content

Set in Place & Level Basin

5:11
11:58
30.8K views

At 5:11 in

How to install a Waterfall feature in 2 hours and 20 minutes Steps 1-6

What happens here

Carefully lower the excavated pondless waterfall basin into the dug-out area. It is recommended to have multiple people assist due to the size and weight of the basin. Once placed, use a long spirit level to ensure the basin is perfectly level across its surface and in all directions. Make adjustments by adding or removing soil beneath and around the basin until it is stable and level. Begin initial backfilling around the basin to secure it in place.

Goal: Securely position and level the waterfall basin in the excavated area.

Tools and materials

  • Long Spirit Level — Ensuring the basin is perfectly level for even water distribution
  • Pondless Waterfall Basin Aquascape — The main water collection and pump housing unit
  • Shovel — Adjusting soil beneath and around the basin for leveling

What they say

Hide

screwdriver to put it in plumbing so now we've got the narrator working well the new watches I get it I get it you guys need a little little softer on the new guy okay so we're in the leveling process right now we've got the actual foundation excavated we're 21 minutes into this build at this point and you're four inches below grade you guys ya proximately four inches and that's because it looks a little bit more natural so if you come up to a pond you don't want the pond sitting up high and then kind of tapering off it's just not gonna work the other nice thing about going a little bit deeper it's gonna give us you a visible height for our water huh yeah so you backfill just the height to where you're gonna actually lay the pipe Chris was just

Auto-generated from the video audio.