Set in Place & Level Basin
5:11
11:58
30.8K views
At 5:11 in
How to install a Waterfall feature in 2 hours and 20 minutes Steps 1-6
What happens here
Carefully lower the excavated pondless waterfall basin into the dug-out area. It is recommended to have multiple people assist due to the size and weight of the basin. Once placed, use a long spirit level to ensure the basin is perfectly level across its surface and in all directions. Make adjustments by adding or removing soil beneath and around the basin until it is stable and level. Begin initial backfilling around the basin to secure it in place.
Goal: Securely position and level the waterfall basin in the excavated area.
Tools and materials
- Long Spirit Level — Ensuring the basin is perfectly level for even water distribution
- Pondless Waterfall Basin Aquascape — The main water collection and pump housing unit
- Shovel — Adjusting soil beneath and around the basin for leveling
What they say
(754 characters)Hide
What they say
(754 characters)Auto-generated from the video audio.