Skip to main content

Set and Level the Basin

5:12
11:58
30.8K views

At 5:12 in

How to install a Waterfall feature in 2 hours and 20 minutes Steps 1-6

What happens here

Carefully lower the pre-formed basin into the excavated hole. Once in place, use a long level across multiple points of the basin's top edge to check for levelness. Adjust the basin's position by adding or removing soil or sand underneath it until it is perfectly level from all directions. This step is critical for proper water circulation and the aesthetic appeal of the waterfall. Ensure the basin is stable and won't shift once water is added and rocks are placed around it.

Goal: Place the pre-formed basin into the excavated pit and use a level to ensure it is perfectly horizontal and stable.

Tools and materials

  • Long Level — Ensuring the basin is perfectly level for proper water distribution
  • Sand or Compactable Soil — Leveling and stabilizing the basin in the excavated pit

What they say

Hide

screwdriver to put it in plumbing so now we've got the narrator working well the new watches I get it I get it you guys need a little little softer on the new guy okay so we're in the leveling process right now we've got the actual foundation excavated we're 21 minutes into this build at this point and you're four inches below grade you guys ya proximately four inches and that's because it looks a little bit more natural so if you come up to a pond you don't want the pond sitting up high and then kind of tapering off it's just not gonna work the other nice thing about going a little bit deeper it's gonna give us you a visible height for our water huh yeah so you backfill just the height to where you're gonna actually lay the pipe Chris was just

Auto-generated from the video audio.