Set and Level the Basin
5:12
11:58
30.8K views
At 5:12 in
How to install a Waterfall feature in 2 hours and 20 minutes Steps 1-6
What happens here
Carefully lower the pre-formed basin into the excavated hole. Once in place, use a long level across multiple points of the basin's top edge to check for levelness. Adjust the basin's position by adding or removing soil or sand underneath it until it is perfectly level from all directions. This step is critical for proper water circulation and the aesthetic appeal of the waterfall. Ensure the basin is stable and won't shift once water is added and rocks are placed around it.
Goal: Place the pre-formed basin into the excavated pit and use a level to ensure it is perfectly horizontal and stable.
Tools and materials
- Long Level — Ensuring the basin is perfectly level for proper water distribution
- Sand or Compactable Soil — Leveling and stabilizing the basin in the excavated pit
What they say
(754 characters)Hide
What they say
(754 characters)Auto-generated from the video audio.