Excavate Basin and Stream Trench
At 4:09 in
How to install a Waterfall feature in 2 hours and 20 minutes Steps 1-6
What happens here
Following the marked outline, begin excavating the area. Dig the hole for the pre-formed basin slightly larger and deeper than the basin itself to allow for leveling material. It's crucial that the bottom of this pit is as level as possible to ensure the basin sits correctly and evenly. Simultaneously, dig a shallow trench along the marked path for the waterfall stream, which will house the flexible hose that carries water from the pump to the top of the waterfall. This trench helps define the stream's course and hide the plumbing.
Goal: Dig a hole for the pre-formed basin, ensuring a level base, and create a trench for the flexible hose that will form the stream bed.
Tools and materials
- Shovels — Excavating the basin hole and stream trench
What they say
(1,129 characters)Hide
What they say
(1,129 characters)Auto-generated from the video audio.