Skip to main content

Fill and Test the Water Feature

0:17
11:58
30.8K views

At 0:17 in

How to install a Waterfall feature in 2 hours and 20 minutes Steps 1-6

What happens here

Once all rocks and gravel are in place, begin filling the pondless basin with water using a garden hose. Fill it until the water level reaches the recommended operating level (usually covering the pump). Once filled, plug in and activate the water pump. Observe the water flow over the waterfall and through the stream. Make any final adjustments to the rocks or gravel to optimize the flow, ensure even distribution, and minimize splashing. Check for any leaks and add more water if necessary to compensate for initial absorption by the surrounding soil and materials.

Goal: Add water to the system until the basin is full, then activate the pump to test the waterfall's flow and make any necessary final adjustments.

Tools and materials

  • Garden Hose — Filling the basin with water
  • Water Tap water — Operating the waterfall

What they say

Hide

the cost of materials how much time it is you see we've got a timer actually set up we will leave complex this job in 2 hours and 20 minutes with two experienced guys and one new now you guys are gonna be able by the time you're done with this video you guys are going to be able to duplicate these results to the T that's the goal of this video and so without wasting any more time I want to introduce you to the group we've got trip we got we've got Brian and then we've got Tim Tim is the

Auto-generated from the video audio.