Lower Pump into Well and Test

17:37
20:57
208.1K views

At 17:37 in

How to Install A Solar Off Grid Well pump System

What happens here

With the pump, pipe, and cables connected, the system is lowered into the 460-foot deep well. The presenter and Eric manually feed the poly pipe and pump into the well casing, which can be challenging as the pipe tries to float. They use a backhoe bucket rigged with a strap to assist in lowering the heavy pump assembly. Once the pump is at the desired depth (200 feet in this case), the well seal is installed, ensuring a watertight and sanitary connection at the top of the well casing. After installation, a draw-down test is performed by monitoring the water level using the level sensor (accessible via Bluetooth on a smartphone app) and pumping water out. This test determines the well's static level and recovery rate. A frost-free hydrant is temporarily installed to allow water access.

Goal: Deploy the pump system and verify well performance

Tools and materials

  • Backhoe Woods Groundbreaker BH100 — Assisting in lowering the pump assembly
  • Frost-free Hydrant — Temporary water access point
  • Smartphone with Bluetooth App — Monitoring well parameters during testing
  • Strap/Webbing — Securing the pump to the backhoe bucket for lowering
  • Submersible Pump Assembly Lorentz — The complete pump, pipe, and cable assembly
  • Well Casing — The well structure receiving the pump
  • Well Seal — Sealing the top of the well casing