Final Assembly, Power Up & Test
1:59
3:15
2.9K views
At 1:59 in
HOW TO INSTALL A CHARGEPOINT NEMA 14-50R IN 3 MINUTES!
What happens here
After all electrical connections are complete and secured, including the GFCI breaker and NEMA outlet, it's time for final assembly and checks. Replace the outer cover plate of the ChargePoint EV charger unit, which typically snaps into place. Close and secure the main electrical panel cover, ensuring the ChargePoint label is clearly visible. Turn the main power back on, and then activate the new GFCI breaker. Finally, test the charger by plugging it into your electric vehicle. The ChargePoint unit should light up, indicating it's ready to charge.
Goal: Complete installation, restore power, and verify functionality
Tools and materials
- Electric Vehicle BMW iX — To test the charging functionality
What they say
(1,270 characters)Hide
What they say
(1,270 characters)Auto-generated from the video audio.