Excavate and Prepare Subgrade
0:51
6:31
640.3K views
At 0:51 in
How to Build a Retaining Wall
What happens here
The first step in building a new retaining wall is to remove any existing structures and prepare the subgrade. If there's an old concrete masonry unit (CMU) retaining wall, remove the blocks using a skid steer with a Stanley MB-550 hydraulic breaker or a mini excavator. Pay particular attention to the footing, as it is often thick and deep, requiring heavy equipment to remove. Once the old structure is removed, compact the subgrade thoroughly. A plate compactor, ranging from 150 to 1,000 pounds, is recommended to ensure the soil reaches full compaction, providing a stable foundation for the new wall.
Goal: Remove existing structures and compact the soil for a stable foundation.
Tools and materials
- Plate Compactor — Compacting the subgrade soil to ensure stability
- Shovel — Manual excavation and clearing debris
- Skid Steer Bobcat — Operating the hydraulic breaker for demolition
- Stanley MB-550 Hydraulic Breaker Stanley — Demolishing old concrete masonry units and footings