The video starts by showing a finished paver patio project and then flashes back to the initial site conditions, which included significant standing water requiring pumping out, followed by a soil correction. The presenter explains that this video will focus on how to bid and estimate such projects, particularly addressing the complexities of deep bases and road fabric. He highlights the previous video that covered the installation process.

Goal: Grasp the specific challenges and requirements of the paver base preparation project.

What they say

Hide

So, in another video, you saw me teach you how to install a paving project like this. In this, we will conduct several lessons on the board, and I will teach you how to calculate and evaluate such a project. Now this option is not quite the usual cobblestone patio. in the video on how to install them. If you notice, we came to this area , we had 8 or maybe 10 inches of standing water that we had to pump out. Then we and after that we had to do a minor soil correction. We're going to use a little trick. I'm going to show you this trick right now. We lay the road geotextile , and then deepen the base material itself. So what you see here is a 5th grade, about 10 inches thick. And then we had to make a bridge, bringing in stones, laying down fabric. Today I will teach you how to evaluate all of this. So

Auto-generated from the video audio.