Account for Paver Cuts and Waste

6:23
18:54
232.2K views

At 6:23 in

How to bid a Paver Patio

What happens here

A crucial aspect of estimating is accounting for paver cuts and waste. The presenter explains that while you might only install portions of pavers for curved edges or patterns, you still purchase full pavers from the supplier. These cut-off pieces are often discarded, but their cost is part of your material expense. To avoid short-changing yourself, it's essential to get a spreadsheet or detailed invoice from the supplier that reflects the total quantity of pavers purchased (including those needed for cuts and waste) rather than measuring the installed area after the job is complete. This ensures that the cost of all materials, including waste, is covered in the billing.

Goal: Ensure all purchased paver materials, including those for cuts and waste, are accurately accounted for in the project estimate.

Tools and materials

  • Supplier Invoice/Spreadsheet

What they say

Hide

write to me and I will explain in more detail. At the beginning of the job, I get a rough figure to give them an estimate. At the end of the work, instead of re-measuring , because this is where you can make a mistake. Let's say this is the end of the work, I have the same semicircle, and I'm taking measurements. It so happens that I don't include this area here, and that's right, because there's no patio there. But to make these semicircular cuts, I have to cut all these paving stones. I have to cut all these blocks, I throw them away, and they are no longer on the site. You can't measure them anymore. I still had to buy them as a contractor. I still had to deliver them to the facility. I still had to cut them up and then physically throw away the leftovers, and they were no longer there to be measured. Good. So how to overcome this? You ask the supplier, whoever he is, to keep records. And I know you're thinking, "What?" No. The supplier will invoice you for the materials. You have a bill to pay. When you buy this paving stone, you have an invoice to pay. You ask the supplier to break down this bill into the number of square feet purchased and the cost per square foot. This will be the most accurate because when you do a return, you will return the entire cobblestone. So, you'll have five or six pieces left, let's say, on a construction site. You will return them to the supplier and they will deduct them from your bill. You will not return the clippings. Of course? They will go in the trash. But you still bought these trimmings for the supplier . So they remain on your bill from the supplier. Therefore, you cannot take measurements on site at the end of the job, because that does not take into account every brick that had to be cut and thrown away. But a spreadsheet from the vendor ensures that you won't be left behind . Now let's take a closer look at pricing and how you break down each component. We

Auto-generated from the video audio.