Measure Project Area Using Squares

3:37
18:54
232.2K views

At 3:37 in

How to bid a Paver Patio

What happens here

The presenter demonstrates a method for accurately measuring irregularly shaped areas for estimation. Instead of trying to calculate complex shapes like semicircles, he recommends breaking the entire project area down into easily measurable squares. For example, a 5x3 square has 15 square feet. He then sums up the area of these individual squares to get a total square footage for the initial estimate. This method is used for an initial estimate, not for final billing, as it accounts for the entire area where material is *purchased* rather than just *installed*.

Goal: Obtain an accurate initial square footage estimate for any project shape by segmenting it into manageable squares.

Tools and materials

  • Tape Measure
  • Whiteboard and Marker

What they say

Hide

want to teach you how to measure these areas because this is something that almost every contractor gets wrong. They come, take a tape measure before starting work, and measure the area. And then they take a tape measure after work and measure the area again. Let me show you why you shouldn't do that. I'll check if I'm writing with a marker. This is important. Therefore. On a semi-elliptical object like ours. This work was essentially a semicircle. Of course? I break all my tasks into squares. I measure in squares because I'm not smart enough to calculate the radius of a semicircle at an angle of 33 degrees on an object. But I'm smart enough to figure out: side times side is going to give you the area in square feet. Of course? So if I measure a 5 by 3 square, I know that it contains 15 square feet. And then I say: you know what? There is something superfluous here. I'll reduce it to nine or seven. At this stage, I'm estimating roughly because I don't need precision for the initial measurement. I need to be approximate. I do n't have to be precise. So I go through and measure the entire project with squares. But in the end, it will ruin you. You don't want to measure with squares at the end. So, to give you a better idea, when I first meet with a client and I need to figure out how many square feet their project is, I break their work down into squares. In this case we have 1, 2, 3, four squares. Each square has, well, let's say, 15, 9, and 9. This one is nine. This one is also nine. So, 35. 39, 48 square feet—that will be the project area. This is just an example. Good. Just an example : at the end of the job, if I leave now, the client pays, let's say, $20 per square foot. They will want to know exactly how many square feet are in this property. They're going to want to know this very precisely because it's costing them $20 per square foot. So you are obligated to get the correct number at the end of the work. I hope I didn't confuse you too much. If so, write to me and I

Auto-generated from the video audio.