Acclimate Flooring & Install Underlayment
3:19
20:02
29K views
At 3:19 in
How NOT to install Hardwood Floors- Before during & After including all our screw ups
What happens here
Before installation, allow the engineered vinyl plank flooring to acclimate in the room where it will be installed for at least 48 hours. This allows the material to adjust to the room's temperature and humidity levels, preventing excessive expansion or contraction after installation. Next, unroll and lay down the blue underlayment foam, which provides a moisture barrier, sound dampening, and a smooth surface. Ensure the underlayment covers the entire area where the flooring will be installed.
Goal: Prepare flooring for installation and lay foundation layer.
Tools and materials
- Blue Underlayment Foam — Providing moisture barrier, sound dampening, and a smooth base
- Engineered Vinyl Plank Flooring COREtec — The flooring material needing acclimation
- Tape Measure — Measuring underlayment sections
- Utility Knife — Cutting underlayment to size
What they say
(1,143 characters)Hide
What they say
(1,143 characters)Auto-generated from the video audio.