Install First Layer of Geo-grid
11:37
19:20
42.8K views
At 11:37 in
How NOT to build a Retaining wall
What happens here
Workers begin installing the geo-grid by unrolling sections of the black mesh material into the excavated trench. The geo-grid is laid flat along the prepared sub-base, extending backwards into the soil behind the front edge of where the blocks will be placed. This step is critical for reinforcing the soil mass and enhancing the overall stability of the retaining wall.
Goal: Place the initial layer of geo-grid to reinforce the retaining wall's foundation.
Tools and materials
- Geo-grid — Reinforcing the soil behind the retaining wall blocks