Install First Blocks with Geo-grid
At 4:29 in
He INSULTED my crew
What happens here
The first layer of concrete retaining wall blocks is carefully positioned on the newly compacted and leveled gravel base. Each block is meticulously set, and its alignment and levelness are verified using a spirit level and adjusted with a rubber mallet as needed. Following the placement of the blocks, a geo-grid, which is a specialized flexible mesh material, is laid out behind this initial course. This geo-grid extends backward, away from the wall, into the area that will be subsequently backfilled. Its purpose is to provide crucial structural reinforcement, tying the wall into the embankment and significantly enhancing its stability, especially on sloped terrains.
Goal: Secure the foundational layer of blocks and initial reinforcement.
Tools and materials
- Concrete Retaining Wall Blocks Versa-Lok — Forming the structural face of the retaining wall
- Geo-grid — Providing soil reinforcement and enhancing the stability of the retaining wall
- Level — Ensuring individual blocks and courses are level and plumb
- Rubber Mallet — Tapping blocks into precise position without damaging them
What they say
(1,073 characters)Hide
What they say
(1,073 characters)Auto-generated from the video audio.