Moisture Testing and Acclimation
0:20
2:18
1.2M views
At 0:20 in
Hardwood, quickly! #flooring #hardwood #learn #infomax
What happens here
Before any installation, hardwood flooring needs to acclimate to the environment of the room for typically 3 to 5 days. During this period, it's essential to perform moisture testing using a moisture meter on both the subfloor and the hardwood planks. The moisture content of these two materials should be within 2-3% of each other to prevent future issues such as cupping, warping, or gapping in the installed floor.
Goal: Ensure proper moisture content balance between subfloor and hardwood.
Tools and materials
- Moisture Meter — Measuring the moisture content of wood and subfloor
- Hardwood Planks — Material to be tested for moisture content
- Subfloor — Material to be tested for moisture content