Moisture Testing and Acclimation

0:20
2:18
1.2M views

At 0:20 in

Hardwood, quickly! #flooring #hardwood #learn #infomax

What happens here

Before any installation, hardwood flooring needs to acclimate to the environment of the room for typically 3 to 5 days. During this period, it's essential to perform moisture testing using a moisture meter on both the subfloor and the hardwood planks. The moisture content of these two materials should be within 2-3% of each other to prevent future issues such as cupping, warping, or gapping in the installed floor.

Goal: Ensure proper moisture content balance between subfloor and hardwood.

Tools and materials

  • Moisture Meter — Measuring the moisture content of wood and subfloor
  • Hardwood Planks — Material to be tested for moisture content
  • Subfloor — Material to be tested for moisture content