Skip to main content

Auger and Pound Initial Well Pipe

7:41
20:44
36.6K views

At 7:41 in

Hand Pounding a Well for the Homestead 4K

What happens here

Once the dowsing location is confirmed, dig an initial hole (approximately 4 feet deep) using an auger or shovel to provide a stable starting point. Attach the well point to the first section of galvanized pipe using a drive coupling. Place a driving cap over the top of the pipe to protect the threads and use a heavy hand maul (post pounder) to pound the pipe and well point into the ground. Ensure the pipe remains as straight as possible, possibly with assistance to hold it steady.

Goal: Dig a starting hole and use a driving cap to pound the well point and initial pipe sections into the ground, ensuring they remain straight.

Tools and materials

  • Auger
  • Driving Cap
  • Hand Maul / Post Pounder
  • Pipe Wrench
  • Shovel

What they say

Hide

so we are auguring the first four feet Frankie so that we can get a three inch PVC pipe in right that's the point as far as we can get with that auger or whatever you know we can get and then that makes changing out the well a little easier is that right yeah it's you know in the future a lot of future reasons but then after that point we start just doing it the old-fashioned way and probably yeah this seems kind of old-fashioned Audrey uh well in by hand no yeah I mean even the tool there's nothing on the electric about it it's just a good old [Music] it can be hard sometimes sometimes loud the old-timers will tell you you got to go through two heart bands to get good water which makes sense you know what I'm saying because yeah the surface water has got to filter through that to get you know so be cleaner and cleaner as it goes filters through the hard pans someone's gonna have to hold it because we wanted it as straight as possible both ways you know no other pipe oh this yep so you kind of trying to hold it make sure I'm pounding it straight down [Music] thank you

Auto-generated from the video audio.