Skip to main content

Assemble and Pound Initial Well Section (First Attempt - Troubleshooting)

7:55
20:44
36.6K views

At 7:55 in

Hand Pounding a Well for the Homestead 4K

What happens here

Thread the well point onto the first section of well pipe using a standard pipe coupling. Begin pounding this section into the pre-dug hole using a hand pounder. This initial attempt often highlights the importance of using specialized drive couplings as regular couplings may break due to the stress of pounding, as demonstrated in the video. If breakage occurs, the pipe and well point will need to be extracted.

Goal: Attach the well point to the first section of pipe using a regular coupling and attempt to pound it into the ground, leading to a crucial learning experience about drive couplings.

Tools and materials

  • Hand Pounder
  • Pipe Wrenches
  • Regular Pipe Coupling
  • Well Pipe Section
  • Well Point

What they say

Hide

and then that makes changing out the well a little easier is that right yeah it's you know in the future a lot of future reasons but then after that point we start just doing it the old-fashioned way and probably yeah this seems kind of old-fashioned Audrey uh well in by hand no yeah I mean even the tool there's nothing on the electric about it it's just a good old [Music] it can be hard sometimes sometimes loud the old-timers will tell you you got to go through two heart bands to get good water which makes sense you know what I'm saying because yeah the surface water has got to filter through that to get you know so be cleaner and cleaner as it goes filters through the hard pans someone's gonna have to hold it because we wanted it as straight as possible both ways you know no other pipe oh this yep so you kind of trying to hold it make sure I'm pounding it straight down [Music] thank you good morning one and all bright and early day today we took a couple steps backwards yesterday we go Skitty with a chain and holes a lot bigger than what it should be for a while and there's no nothing down in it good morning Frankie I had a great idea here what's that why don't we just uh go ahead well work on the well but instead of putting up the greenhouse because no matter what if we don't get water here we could always put a little shed around the water once we get water why don't we just get the well done and then we'll put the greenhouse up around if you think that's a pain in the butt or something no no no no but then there's there's four of us standing here

Auto-generated from the video audio.