Skip to main content

Final Temporary Grading and Evaluation

15:26
19:10
112.3K views

At 15:26 in

Grading a dangerously steep driveway

What happens here

With the temporary hydraulic fix in place, continue operating the skid steer to complete the grading and widening of the driveway. Focus on creating smooth transitions and consolidating the loose soil as much as possible to enhance stability. Once satisfied with the temporary improvements, perform a final walk-through to assess the ease of access and overall safety. Discuss potential long-term solutions, such as further re-routing the driveway or bringing in additional stabilizing fill to create a permanently flat and manageable entrance, possibly incorporating organic material with a clay binder to stitch the soil together.

Goal: Resume grading to complete the temporary driveway fix, ensuring enough stability and width for immediate use, followed by a final evaluation of the work and consideration of long-term plans.

Tools and materials

  • Bucket Attachment

What they say

Hide

accomplish that at this point [Music] all right let's just check out how we've done so far i took a little bit of the soil from up there i cut this down this is not the finished finish game plan eventually what i'm going to do is bring the driveway that way i'll take some of this topsoil right here spreading grade this over but this this allows me to cut get up and down right now and here we go i mean we're we're in pretty decent shape this driveway's much easier to to manage the first time i walked up this driveway i had to grab my uncle's hand and pull them up because it was so steep now you can just walk up and down like it's no big deal use the organic material on the top because that had a little bit of a clay binder and if it reestablishes some vegetation that'll stitch that soil together but i think she's i think she's a good temporary fix on this one and the ultimate game plan will be to take that driveway carve it right over there and then to grab it right up into that part of the road and then you then we'll have a virtually flat driveway coming in and out and that just means that i've got to grab some fill from other places and carve it through but that'll be a long-term game plan that's one option option number two is to bring in about six feet of fill and just come right off the road and up to here that would be a very straight short driveway so a couple different ways to to skin that cat but that's it for this one today hope you enjoyed it i hope you hit that like button and i hope you subscribe and tell a couple of your friends and that's all we got for you today thank you guys much appreciated for coming along for the ride i love projects like this i just love coming in here and just going what can we do i hope you do too if you do that's the kind of thing let me know god bless you guys go get them we'll catch you on another one

Auto-generated from the video audio.