Skip to main content

Complete Temporary Driveway Grading and Evaluate Progress

13:55
19:10
112.3K views

At 13:55 in

Grading a dangerously steep driveway

What happens here

Resume operating the skid-steer loader, carefully managing its functions due to the temporary hydraulic repair. Continue spreading and grading the soil to achieve a smoother, wider, and less steep driveway. The goal is to make the driveway manageable for winter conditions. Once the temporary grading is complete, step back and evaluate the work. The driveway should now be traversable and less hazardous. Discuss potential long-term solutions, such as curving the driveway around the property for a more gradual slope or bringing in additional fill to raise the entire drive to a flat grade, creating a permanent, worry-free solution. The focus is on ensuring immediate functionality while keeping future, more robust improvements in mind.

Goal: Finalize the temporary grading of the driveway, ensuring it is smooth and safe enough for winter access. Review the completed work and discuss long-term plans for a permanent driveway solution.

Tools and materials

  • ASV RT-75 Skid-Steer Loader
  • Organic Materials (topsoil)

What they say

Hide

working though thankfully we've got this grade at least not right but it's not wrong when i say it's not right it's not wrong it's not finished it's a far it's far from finished but at least it's smooth enough that we can get equipment up here and work over the winter before frost it's been we've already had three three snow storms so next phase is bringing the soil down here and widening out this driveway we're gonna be pushing all that down i think we're gonna go this way with it yeah i think we'll go this way we got a culvert opening i don't have an extension so we're gonna it'll be a pinch point right here but if i got enough dirt i can bring some on this side i don't have enough dirt that's not the worry poor part anyway if i can get this side fleshed out formed down and built up that'll cut the top off and just make it easier to come down i think that's what we'll do all right let's hope let's hope we got enough hydraulic fluid left we may have leaked too much to even accomplish that at this point [Music] all right let's just check out how we've done so far i took a little bit of the soil from up there i cut this down this is not the finished finish game plan eventually what i'm going to do is bring the driveway that way i'll take some of this topsoil right here spreading grade this over but this this allows me to cut get up and down right now and here we go i mean we're we're in pretty decent shape this driveway's much easier to to manage the first time i walked up this driveway i had to grab my uncle's hand and pull them up because it was so steep now you can just walk up and down like it's no big deal use the organic material on the top because that had a little bit of a clay binder and if it reestablishes some vegetation that'll stitch that soil together but i think she's i think she's a good temporary fix on this one and the ultimate game plan will be to take that driveway carve it right over there and then to grab it right up into that part of the road and then you then we'll have a virtually flat driveway coming in and out and that just means that i've got to grab some fill from other places and carve it through but that'll be a long-term game plan that's one option option number two is to bring in about six feet of fill and just come right off the road and up to here that would be a very straight short driveway so a couple different ways to to skin that cat but that's it for this one today hope you enjoyed it i hope you hit that like button…

Auto-generated from the video audio.