Skip to main content

Prepare Trenching Equipment

6:44
23:39
68.2K views

At 6:44 in

Franky almost killed me trenching an underground line.

What happens here

The trenching attachment is transferred from the pickup truck to the mini-loader. This typically involves aligning the attachment with the loader's quick-attach system and securing it with pins. The hydraulic lines are then connected to power the trencher. An initial test run is performed to ensure the trencher engages and operates as expected. The operator tests the trencher's chain rotation and hydraulic functions, preparing for active trenching.

Goal: Attach the trencher to the mini-loader and perform initial function checks to ensure it's operating correctly.

Tools and materials

  • Mini-loader (e.g
  • CASTLOADERS Carbon 33T)
  • Trenching Attachment

What they say

Hide

say okay she works right away we got one side in yeah yep we're in let's give her a test run let's put it in tupac [Music]

Auto-generated from the video audio.