Prepare for Trenching Operations
0:00
23:39
68.2K views
At 0:00 in
Franky almost killed me trenching an underground line.
What happens here
The video begins with the crew surveying the area where a new 200-foot gas pipeline needs to be installed, running from a house to a tank. The decision is made to run a new line rather than move the existing tank. The operator then travels to 'Top Notch Equipment' in Rogers, Minnesota, to pick up a trencher attachment for a mini-loader. The trencher attachment is loaded onto the back of a pickup truck using a forklift.
Goal: The initial step involves assessing the job site, identifying the path for the new gas pipeline, and acquiring the necessary equipment, including a trencher attachment for a multi-traction mini-loader.
Tools and materials
- Forklift
- Pickup Truck
- Trencher Attachment
What they say
(461 characters)Hide
What they say
(461 characters)Auto-generated from the video audio.