Lay Gas Pipe and Connect Fittings
At 1:43 in
Franky almost killed me trenching an underground line.
What happens here
The yellow 'Pro-Poly Direct Burial Gas Piping System' (1" IPS-SDR 11 MDPE GAS PIPE, 300' COIL) is uncoiled and guided into the freshly dug trench. The gray riser tubes, which cost approximately $57 each, are attached to the yellow pipe using specialized yellow and black plastic fittings that resemble plumbing connectors. These fittings are designed to be leak-proof and certified for underground gas lines. The connections are secured by tightening them with a pipe wrench, ensuring a safe and durable gas line installation.
Goal: Once a section of the trench is dug, the flexible yellow 'Pro-Poly Direct Burial Gas Piping System' is carefully uncoiled and laid into the trench, followed by connecting the grey riser tubes and specialized fittings.
Tools and materials
- Pipe Wrench
- Black Stiffeners
- Gray Riser Tube
- 300' COIL)
- Specialized Yellow/Black Fittings
What they say
(402 characters)Hide
What they say
(402 characters)Auto-generated from the video audio.