Backfill and Grade the Trench
At 17:30 in
Franky almost killed me trenching an underground line.
What happens here
After the gas line is laid and connected, the mini-loader is used to push the excavated soil back into the trench. The operator emphasizes that driving over the backfilled soil immediately is not ideal, but in this case, it's necessary for the process. A power rake attachment is then used on the front of the mini-loader to effectively spread and level the displaced soil, creating a smooth and even surface. The power rake blends the loose soil with the surrounding undisturbed ground, restoring the area to a graded state. The goal is to achieve a finished grade that is as close to the original surface as possible, minimizing visible signs of the trenching work.
Goal: Backfill the trench with the excavated soil and use a power rake attachment on the mini-loader to rough grade and smooth the disturbed area.
Tools and materials
- Mini-loader with Bucket Attachment
- Power Rake Attachment
What they say
(815 characters)Hide
What they say
(815 characters)Auto-generated from the video audio.