Lay and Connect Gas Piping
15:05
23:39
68.2K views
At 15:05 in
Franky almost killed me trenching an underground line.
What happens here
Once a section of the trench is dug, the yellow 'Pro-Poly Direct Burial Gas Piping System' (1" IPS-SDR 11 MDPE GAS PIPE, 300' coil) is unrolled and carefully laid into the trench. The sections of pipe are connected using specialized yellow and black compression-style fittings. The connectors have internal stops and stiffeners to ensure a secure, leak-proof seal suitable for underground gas lines. The connections are tightened using pipe wrenches, guaranteeing proper installation.
Goal: Place the specialized direct burial gas piping into the newly dug trench and securely connect the sections using approved fittings.
Tools and materials
- Direct Burial Gas Piping (Pro-Poly)
- Pipe Wrenches
- Specialized Gas Pipe Connectors