Install Drainage and Backfill

4:01
12:13
37.2K views

At 4:01 in

Finishing the Project & details cutting blocks

What happens here

Utilize a mini excavator, such as a Bobcat 325, to dig a trench behind the newly laid retaining wall. This trench will house the drainage system. Install drain pipes (e.g., corrugated drain tile) within this trench. Once the pipes are in place, backfill the area behind the wall and around the pipes with a good quality crushed aggregate (like 3/4 clear drainage aggregate). Compact the aggregate using a plate compactor to ensure stability and proper water flow away from the wall structure.

Goal: Excavate the area behind the retaining wall for drainage, install drain pipes, and backfill with crushed aggregate to ensure proper water management.

Tools and materials

  • Bobcat 325 Mini Excavator
  • Drain Pipes (corrugated drain tile)
  • Plate Compactor

What they say

Hide

if you look closely you'll see where we're building the brand new retaining wall is just a few feet in front of the old retaining wall but that space between the two is filled up with three-quarter clear drainage aggregate and that's reinforced with geobread now burying a retaining wall like this behind an existing retaining wall is actually an okay scenario when done under the right circumstances one of those circumstances is if removing the old retaining wall jeopardizes a structure then look at the option of building a new wall in front of the old wall and tying them now you can actually use this same process on timber retaining walls with caution the timber wall will break down when it's buried but the encapsulation process or burying it behind another retaining wall dramatically slows down how fast that wall will break down and so you have to wait is the potential for that wall to slowly decay behind the existing wall worse than the process of entirely removing it and jeopardizing a structure that's something that you have to weigh in an individual case-by-case basis okay so plan wayne's getting materials i am gonna cut in our next piece of drain tile which is gonna be right in here we're stepping up our corner right here and then we're going to step up again right about here so that's the first thing that we're going to work on is get this base in get the rest of this corner built and then we're going to work on dialing in the grade behind the wall then if we have time left over at the end of the day we're going to start getting the front of the wall kind of grated out more gooder the previous retaining wall was built too high which then trapped the water between the swimming pool and the retaining wall forcing everything to go down and through it and without enough drainage aggregate the wall eventually failed what we're doing differently this time is adding a lot of extra drainage aggregate we're going to add geogrid into the wall which you can see going in place and we're going to shorten the wall forcing the water to not just go behind the wall but it can also go over the face of the wall at the same time [Music]