To address the heavy weight of the composite decking, a new strategy is proposed: instead of creating large, heavy panels, the boards will be installed individually in smaller sections. This approach significantly reduces the weight of each removable piece, making seasonal installation and removal much more manageable. The speaker, initially hesitant about this unconventional method, is convinced by the practicality of handling lighter, individual boards.

Goal: Redesign the dock to accommodate the heavy composite material for easier handling.

What they say

Hide

no there that is one of the drawbacks is yeah this stuff is heavier than all get-out I would you say it's twice as heavy as would maybe I would say I'd say maybe three even three times Oh we're guessing both I'm not concerned about the extra weight affecting the doc as much as I am about it affecting the people that have to carry the doc pan in and out every year let's put it this way a four foot section of moisture shoe would weigh about as much as an eighth or even twelve foot section of regular wood and so we've got to do something to make it manageable hi start sharing them pals what if we made shorter panel so Frankie comes up with the idea instead of building panels just to lay the individual pieces out and at first I want nothing to do with it because it just seems like a lot of extra work I'll pick up a panel do a watch cuz right now we've got four foot panels if we're worried about weight we could you know I think part of my

Auto-generated from the video audio.