Skip to main content

Install Individual Decking Boards

5:39
13:45
48.6K views

At 5:39 in

FAST 3 hour dock rebuild

What happens here

The newly cut individual composite boards are transported to the dock area. The process of laying these boards onto the existing dock frame begins. The individual boards are placed side-by-side, covering the metal frame structure. This method allows for flexibility in placement and easier adjustments compared to large, pre-assembled panels. This approach proves to be efficient and effective for covering the dock frame.

Goal: Install the cut composite decking boards onto the dock frame.

What they say

Hide

could you know I think part of my hesitation about trying the individual pieces is I've never actually seen a doc in individual pieces before in my life but Frankie's pretty persuasive all right so Frankie has convinced me not to put the doc sections together well we see as a panel okay like you see if you're gonna carry four of them off you're carrying six well feeling basically be carrying five because the four and then have two streams that's cool you'll be carrying five boards up but the difference is just peeling up four or five boards carry them up carom off just peel up four or five boards put in a pile grab the pile pick them up yeah I mean it kind of makes sense to be honest with you and especially as heavy as these panels are so this is a panel we carry it all the pieces like that which would voice you shields gonna be heavy or we literally just peel up four five boards carrying like that [Music]

Auto-generated from the video audio.