Unloading and Initial Placement of the Corrugated Pipe
3:40
17:06
42.8K views
At 3:40 in
Failing to Build a Bomb Shelter #1
What happens here
On a subsequent day, the large corrugated metal pipe is delivered to the site. A Kubota SVL 75-2 skid steer, equipped with long fork extensions, is used to carefully unload the pipe from the delivery trailer. The operator, Alex, demonstrates skilled maneuvering to lift the heavy pipe off the trailer. Two wooden planks are placed on the ground to aid in rolling the pipe safely off the forks and onto the driveway, preventing damage to the asphalt and providing a stable surface for temporary storage.
Goal: Safely unload the large pipe and temporarily position it on the driveway.
Tools and materials
- Fork Extensions — Providing extra reach and support for the long pipe
- Kubota SVL 75-2 Skid Steer Kubota — Lifting and maneuvering the heavy pipe
- Large Corrugated Metal Pipe — The main component of the shelter
- Wooden Planks N/A — Protecting the driveway and assisting in rolling the pipe off the forks