The project begins with the use of a Daewoo Solar 75V excavator, equipped with a hydraulic grapple and thumb attachment, to dig a trench along a sloped hillside. The initial excavation removes loose soil, branches, and other debris to create a path and foundational space for the large corrugated metal pipe. The operator, Alex, works to create a suitable trench that will allow the pipe to be buried several feet underground, as discussed with the property owner. The excavator also aids in clearing larger pieces of debris like logs and rocks from the path.
Goal: Prepare the site and excavate a trench for the pipe shelter.
Tools and materials
- Daewoo Solar 75V Excavator Daewoo — Digging the trench and clearing debris
- Hydraulic Grapple/Thumb Attachment — Handling larger debris like logs and rocks, and aiding in clearing
- Debris — Removed from the excavation site
- Dirt/Soil N/A — Excavated from the trench, to be used later for backfilling