Backfilling and Securing the Underground Pipe Shelter
11:12
17:06
42.8K views
At 11:12 in
Failing to Build a Bomb Shelter #1
What happens here
With the pipe positioned at the edge of the trench, the excavator is again employed. Using its arm and bucket, the excavator carefully backfills the soil around the corrugated metal pipe. The soil is pushed and compacted to securely encase the pipe, ensuring it is properly supported and buried as an underground shelter. This process requires precise control of the excavator to avoid damaging the pipe while ensuring adequate coverage.
Goal: Completely bury the pipe shelter with excavated soil.
Tools and materials
- Daewoo Solar 75V Excavator Daewoo — Backfilling the trench
- Large Corrugated Metal Pipe — The buried shelter
- Dirt/Soil N/A — Used to backfill the trench