Import and Manually Compact Fill Soil
At 4:29 in
FAILING house foundation 2/2 . 4 k video
What happens here
After the drainage is installed, new fill soil is imported to achieve the desired grading. A large dump truck delivers a load of gravel to the site. A Bobcat T180 skid steer loader with a bucket attachment is used to transport and distribute the gravel into the excavated areas around the foundation. Due to the repaired yet still vulnerable foundation, manual compaction is preferred over heavy machinery. Workers use hand tampers to compact the gravel in layers, ensuring stability without risking further damage to the foundation. This process also involves removing any remaining wet, unsuitable soil from the site and replacing it with dry, compactable material.
Goal: Backfill the excavated area with suitable material and compact it carefully to establish new grades.
Tools and materials
- Bucket Attachment — Scooping and distributing fill material
- Dump Truck — Transporting and delivering gravel fill soil
- Hand Tamper — Manually compacting soil to prevent settlement
- Rake — Fine-grading the fill soil
- Shovel — Spreading and leveling fill soil manually
- Skid Steer Loader Bobcat T180 — Moving and spreading large quantities of gravel
- Gravel — New fill soil for grading and drainage
What they say
(1,240 characters)Hide
What they say
(1,240 characters)Auto-generated from the video audio.