Installing Drainage and Final Backfill/Grading
At 15:38 in
FAILING house foundation 1/2 4 k video
What happens here
With the excavation complete and drainage elements in place (perforated pipe and landscaping fabric), the next phase involves backfilling the trench with gravel and soil, followed by grading the area to ensure proper water diversion. This step is largely anticipated, as the video ends with the preparation for these actions. The final grading around the foundation aims to create a slope that directs water away from the house, preventing future accumulation and potential intrusion. The existing trees and bushes have been removed to facilitate this improved grading. The team is observed laying down landscaping fabric and positioning the flexible drainage pipes. Gravel will then be added over the pipes, and the remaining soil will be used to restore the grade. The contractor expresses his concerns about the homeowner's chosen 'patch and waterproof' method versus a complete structural repair, inviting viewers to share their opinions on the best course of action.
Goal: Complete the drainage system and regrade the landscape to divert water away from the foundation.
Tools and materials
- Bobcat 325 Mini-Excavator Bobcat — Moving and spreading soil and gravel for backfilling and grading
- Flexible Perforated Drainage Pipe — Collecting and diverting groundwater away from the foundation
- Gravel — Providing an effective drainage medium around the perforated pipe
- Landscaping Fabric — Protecting drainage pipes from clogging and separating soil layers
- Rake — Smoothing and leveling the soil for final grading
- Shovel — Fine-tuning grading and spreading materials
What they say
(668 characters)Hide
What they say
(668 characters)Auto-generated from the video audio.