Toe-In First Course and Prepare for Inclement Weather

11:15
15:59
76.2K views

At 11:15 in

Double Terraced wall Crashes down pt1

What happens here

Once the first course of blocks is laid and perfectly level, backfill the area around and behind them with soil and compact it. This process, known as 'toeing in,' helps to lock the first course into place, providing additional stability. As the video demonstrates, if rain is in the forecast, it is crucial to protect the exposed work site. Cover all excavated areas and any newly laid base material or blocks with heavy-duty tarps (e.g., polypropylene tarps). Secure the tarps using heavy items like extra blocks or sandbags to prevent them from blowing away or allowing water to seep underneath. Ensure that any newly installed drainage components, such as drain tiles or downspout extensions, are properly connected and functioning to direct water away from the construction zone.

Goal: Backfill and 'toe-in' the first course of blocks to secure it, then implement weather protection measures like covering exposed areas with tarps if rain is expected.

Tools and materials

  • Shovels
  • Tarps
  • Weights (e.g
  • extra blocks
  • sandbags)

What they say

Hide

now there's rain in the forecast and the boys got to lock everything down and tarp everything over as if they don't know if they can come back to work the next day drain tile up to the downspout we're supposed to get an inch of rain tomorrow does that happen with how this grade is going it's gonna send everything and it was a bad corner here by where we're working and that is not very ideal so we got half of our base in first rung Oh good to go so that's all we've got for

Auto-generated from the video audio.