Phased Excavation and Obstruction Removal
At 1:12 in
Double Terraced wall Crashes down pt1
What happens here
Due to the existing garage being supported by the old retaining wall, the demolition and excavation must be done in sections. Utilize a mini-excavator (e.g., Bobcat 325 or similar) to begin digging the trench for the new lower wall. As you excavate, be prepared for unexpected obstructions. In this video, an old concrete footing was discovered. To remove such obstructions, use a concrete saw (e.g., Stihl Cut-off Saw or similar) to cut the concrete into manageable pieces. The mini-excavator can then assist in lifting and moving these pieces for disposal. The trench should be excavated to approximately 2 feet wide and 1 foot below the final desired grade to accommodate the base material and the buried portion of the first block course.
Goal: Carefully excavate the trench for the new lower retaining wall in phases to maintain structural integrity, addressing any unforeseen obstructions like old concrete footings by cutting and removing them.
Tools and materials
- Concrete Saw
- Ear Protection
- Mini-Excavator
- Safety Glasses
- Shovels
- Tape Measure
What they say
(1,215 characters)Hide
What they say
(1,215 characters)Auto-generated from the video audio.