Final Base Adjustment and Block Staging
At 7:46 in
Double Terraced wall Crashes down pt1
What happens here
Even with mechanical compaction, minor adjustments to the base may be needed. Use shovels or rakes to adjust the aggregate level, removing or adding small amounts as required. Re-compact any areas that have been disturbed. While this is happening, stage the retaining wall blocks. Use the skid steer, fitted with pallet forks, to carefully transport pallets of new retaining wall blocks (e.g., Keystone blocks or similar segmented retaining wall units) to a convenient location near the trench. Exercise caution when moving heavy pallets to prevent accidents or damage.
Goal: Make any necessary final adjustments to the compacted base level by hand and stage pallets of retaining wall blocks efficiently near the installation area.
Tools and materials
- Shovels/Rakes
- Skid Steer with Pallet Forks
- Retaining Wall Blocks
What they say
(342 characters)Hide
What they say
(342 characters)Auto-generated from the video audio.