Skip to main content

Compact and Level the Base

5:16
15:59
76.2K views

At 5:16 in

Double Terraced wall Crashes down pt1

What happens here

Once the angular stone is spread, use a plate compactor (e.g., North Star or similar with a Honda GX engine) to thoroughly compact the entire base. Make multiple passes in different directions to ensure maximum density and stability. After initial compaction, a string line with a string level attached (like a Johnson Level & Tool 100 or similar) can be set up as a rough guide for excavation. This line helps determine the general height and the face of where the wall will go. While useful for initial shaping, remember this is only a guide; the final leveling will occur during block installation.

Goal: Thoroughly compact the stone base material in the trench using a plate compactor and establish a preliminary string line for a rough excavation guide.

Tools and materials

  • Plate Compactor
  • String Level
  • String Line

What they say

Hide

the corner is a little tight in awkward to form with the mini X so the guys do the last bit of contouring by hand now they can't squeeze the skid loader into the corner of that retaining wall so he's gonna dump all of the rock at the end of the trench and then they'll hand shovel it where it needs to go string level is set up just as a rough guide for the excavation this will help the guys determine where the face of the wall goes and the general height but that's not the final guide this needs to be close and then we'll level off the blocks they find out they've got a little bit too much base in place which means that they can't get the right amount of block buried so some of it has to come back out getting that first course correct is critical and we're going to show you in real time exactly how long that takes because they altered the height of the base it has to be recompense tart basing

Auto-generated from the video audio.