Laying the First Course of Blocks (Critical Detail)
At 9:11 in
Double Terraced wall Crashes down pt1
What happens here
The first course of blocks is the most critical as it sets the foundation for the entire wall. Begin laying the blocks directly on the prepared and compacted angular stone base, typically starting from a corner or a fixed point. For each block, use a dead blow hammer (or a rubber mallet) to gently tap it into place until it is firmly seated. Immediately check the level of the block, both front-to-back and side-to-side, using a standard level (e.g., Johnson Level & Tool magnetic level or similar). If a block is not level, lift it, adjust the aggregate beneath it (adding or removing material by hand), and then re-seat and re-check the level. Repeat this process until each block in the first course is perfectly level. The video emphasizes that for mortarless systems, the base must be perfect, as there is no mortar to compensate for imperfections. Pay close attention to the setbacks between blocks (e.g., half-inch per course) as specified by the block manufacturer. In a team setting, one person (the 'baser') stays in the trench, focusing solely on leveling, while another 'feeds' them blocks and assists with major base adjustments.
Goal: Meticulously lay the first course of retaining wall blocks, ensuring each block is perfectly level and aligned, which is crucial for the stability and aesthetics of the entire wall.
Tools and materials
- Dead Blow Hammer (or Rubber Mallet)
- Level
- Shovels/Rakes
- Retaining Wall Blocks
What they say
(1,423 characters)Hide
What they say
(1,423 characters)Auto-generated from the video audio.