Skip to main content

Install Base Cabinets and Level

4:03
17:23
317.2K views

At 4:03 in

DIY BUILT-IN READING NOOK | NURSERY MAKEOVER

What happens here

Position the assembled base cabinet boxes on top of the installed 2x4 toe kick frames. Secure the base cabinets to both the wall studs and the toe kicks using appropriate fasteners. Because walls are rarely perfectly straight, use a level and wood wedges (shims) to level all cabinets during installation. The creator notes that gaps can be filled with shims between the cabinet and the wall, which is a common practice in cabinetry to avoid damaging drywall.

Goal: Secure and level the base cabinet boxes

Tools and materials

  • Assembled Base Cabinets — The main storage units
  • Cordless Drill DeWalt — Driving screws
  • Level — Ensuring cabinets are perfectly horizontal and vertical
  • Wood Wedges — Leveling the cabinets and filling gaps against uneven walls