Skip to main content

Material Transport for Rebuilding

1:24
23:31
47.4K views

At 1:24 in

Demolition Day

What happens here

Begin transporting new construction materials to the immediate work area. Utilize the ASV RT-75 Posi-Track with a bucket attachment to move concrete blocks from storage or delivery to a convenient staging point near the house. For the heavier steel I-beams, attach specialized forks to the CastLoaders 33T Carbon mini loader. Carefully lift and maneuver the I-beams, placing them precisely onto temporary support structures on the deck or ground level, ready for installation.

Goal: Concrete blocks and new steel I-beams, necessary for the facade rebuilding, are transported using the skid steers. The CastLoaders 33T Carbon (mini loader) is fitted with specialized fork attachments to precisely move the heavy steel beams onto a temporary support structure (likely a staging area for cutting and placement). Concrete blocks are also transferred using the skid steer's bucket.

Tools and materials

  • ASV RT-75 Posi-Track
  • Bucket Attachment
  • CastLoaders 33T Carbon
  • Specialized Fork Attachments
  • Concrete Blocks N/A
  • Steel I-Beams N/A

What they say

Hide

rebuild it yeah before we can do anything we gotta get diesel fuel [Music]

Auto-generated from the video audio.