Facade Demolition & Debris Removal
At 8:15 in
Demolition Day
What happens here
Attach a grapple bucket to the ASV RT-75 skid steer. Begin methodically removing the remaining stone veneer and other facade components from the building. Collect all demolition debris, including insulation and removed windows, into the grapple bucket and transport it to a designated burn pile or an appropriate waste disposal area. Simultaneously, set up ladders and temporary scaffolding platforms along the remaining facade sections to allow manual removal of smaller or more delicate elements. Ensure personnel working on ladders or scaffolding adhere to safety protocols.
Goal: The ASV RT-75 skid steer, now with a grapple bucket, continues to remove the remaining stone veneer and other facade elements from the building. Debris (including insulation and windows) is loaded into the bucket and transported to a designated burn pile or waste area. The team also prepares temporary scaffolding platforms for manual facade removal tasks.
Tools and materials
- ASV RT-75 Posi-Track
- Grapple Bucket
- Hand Tools
- Ladders
- Personal Protective Equipment (PPE)
- Temporary Scaffold Systems