Lay the First Course of Blocks
3:48
15:42
214.8K views
At 3:48 in
Deck Inspection Brings Our Job to a DEAD stop.
What happens here
Lay the first course of interlocking concrete retaining wall blocks directly on the compacted gravel base. Ensure each block is level from front to back and side to side using a spirit level. Use a rubber mallet to gently tap blocks into place for minor adjustments. Continue laying blocks, ensuring tight seams and a consistent setback (if required by the block type) for each course. Periodically check the overall level and alignment of the course using a long level or string line.
Goal: Establish the level and stable base course of the retaining wall.
Tools and materials
- Rubber Mallet — Adjusting blocks into position
- Spirit Level — Checking the level of individual blocks and entire courses
- String Line and Stakes — Maintaining a straight line for the wall
What they say
(114 characters)Hide
What they say
(114 characters)Auto-generated from the video audio.