Construct Subsequent Courses and Backfill
At 8:57 in
Deck Inspection Brings Our Job to a DEAD stop.
What happens here
Once the first course and any auxiliary lumber are installed, continue stacking the interlocking concrete blocks. For each subsequent course, ensure the blocks are offset from the course below (typically half a block) to create a stronger, more stable wall. After every one or two courses, backfill the area behind the blocks with approximately 6-8 inches of crushed rock or gravel. Spread the gravel evenly and then compact it using the vibratory plate compactor. For areas close to the wall where the compactor cannot reach, use a hand tamp to compact the gravel. Continue this process of laying courses, offsetting blocks, backfilling with gravel, and compacting until the desired height of the retaining wall is achieved. Periodically check for levelness and plumb as you build to prevent leaning.
Goal: Build the retaining wall to the desired height with proper drainage and stability.
Tools and materials
- Gravel — Providing drainage and stability behind the retaining wall
- Hand Tamp — Compacting gravel in tight spaces
- Rakes — Spreading and leveling gravel backfill
- Rubber Mallet — Adjusting blocks into position
- Shovels — Spreading gravel backfill
- Skid Steer Caterpillar — Delivering gravel backfill to the site
- Spirit Level — Checking the level and plumb of blocks
- Vibratory Plate Compactor Wacker Neuson — Compacting gravel backfill