Install Gap-Filling Lumber and Secure to Foundation
At 6:46 in
Deck Inspection Brings Our Job to a DEAD stop.
What happens here
To fill the gap between the existing house foundation and the newly constructed retaining wall, cut 2x10 pressure-treated lumber to size. Position these lumber pieces vertically against the house foundation, creating a continuous barrier. Secure the lumber to the foundation using L-brackets. First, use a hammer drill with a masonry bit to drill pilot holes into the concrete block foundation. Insert Tapcon screws through the L-brackets and into the pilot holes, fastening the lumber securely. Apply exterior-grade sealant along the edges of the lumber where it meets the foundation and the retaining wall blocks to prevent water intrusion. This step ensures a tight seal and prevents soil or water from seeping between the structures.
Goal: Create a weather-tight and secure connection between the retaining wall and the house foundation.
Tools and materials
- Caulking Gun — Applying sealant
- Hammer Drill Makita — Drilling pilot holes into the concrete block foundation
- L-Brackets — Securing the lumber to the foundation
- Masonry Drill Bit — Drilling into concrete blocks
- Tapcon Screws Tapcon — Anchoring the L-brackets to the concrete foundation
- Trowel or Finger — Smoothing applied sealant
- Utility Knife — Cutting sealant tube tips
- 2x10 Pressure-Treated Lumber — Creating a barrier between the retaining wall and foundation
- Exterior-Grade Sealant — Sealing gaps against water intrusion
What they say
(787 characters)Hide
What they say
(787 characters)Auto-generated from the video audio.