Initial Land Assessment and Setup
0:47
5:39
401K views
At 0:47 in
Day 2: What does it cost to clear land? Removing stumps, smooth land for planting grass or pasture
What happens here
The project begins with an assessment of the undeveloped farm land, which is characterized by dense tree cover, numerous stumps, deep 'hollers' (valleys or large holes), and significant rock formations. The primary objective is to clear approximately 2.5 to 3 acres to create usable pasture and an expanded front yard. Heavy machinery, including an excavator and a bulldozer (loader), are brought in to begin the process of deforestation and initial earthmoving.
Goal: Identify the scope of work and deploy necessary heavy machinery for clearing.
Tools and materials
- CAT 318CL Excavator CAT — Initial digging, tree removal, and lifting of large rocks and stumps
- CAT 963C Bulldozer/Loader CAT — Pushing cleared material, leveling ground, and filling in depressions